
Add constraint to limit the number of patches (habitat + restoration)
Source:R/add_nb_patches_constraint.R
add_nb_patches_constraint.RdAdd constraint to a restoration problem (restopt_problem()) object
to specify the number of patches (habitat + restoration) that can be
present within a solution.
Arguments
- problem
restopt_problem()Restoration problem object.- min_nb_patches
integerMinimum number of patches.- max_nb_patches
integerMaximum number of patches.
Value
An updated restoration problem (restopt_problem()) object.
Details
A patch is a spatially continuous set of habitat and restoration planning units. This constraints applies on the union of the set of planning units that are selected for restoration and the initial habitat patches, and allows to specify a minimum and maximum number of patches. In practice, this constraint is useful to set simple targets for structural connectivity.
Examples
if (FALSE) { # \dontrun{
# load data
habitat_data <- rast(
system.file("extdata", "habitat_hi_res.tif", package = "restoptr")
)
# create problem
p <- restopt_problem(
existing_habitat = habitat_data,
aggregation_factor = 16,
habitat_threshold = 0.7
) %>%
add_restorable_constraint(
min_restore = 10,
max_restore = 100,
) %>%
add_nb_patches_constraint(1, 1)
# plot preprocessed data
plot(rast(list(p$data$existing_habitat, p$data$restorable_habitat)), nc = 2)
# print problem
print(p)
# Solve problem
s <- solve(p)
# plot solution
plot(s)
} # }